| 000 | 00753nam a22002417a 4500 | ||
|---|---|---|---|
| 003 | IRIL | ||
| 005 | 20231020135417.0 | ||
| 008 | 231020b ||||| |||| 00| 0 eng d | ||
| 082 | _a627 EVA 1985 | ||
| 110 | _aPRC Engineering. | ||
| 245 |
_aAn evaluation of existing irrigation water pricing policy in Pakistan. / _cPRC Engineering. |
||
| 260 |
_aIslamabad: _PRC Engineering / CHECCHI, _c1985. |
||
| 300 |
_aVarious pages: _bTables, _c28cm. |
||
| 490 | _aGovernment of Pakistan/USAID Irrigation systems management project. | ||
| 505 | _aIntroduction | ||
| 505 | _aEconomic evaluation | ||
| 505 | _aCost recovery | ||
| 546 | _aIn English | ||
| 563 | _aPbk | ||
| 650 | _aWater pricing policy | ||
| 650 | _aIrrigation | ||
| 942 |
_2ddc _cReport |
||
| 999 |
_c2063394 _d2063390 |
||