Feasibility study of small dams and water storages: Task III pc-I of tamman dam / Gentek Consult Ltd Turkey In Association with AAB (Pvt) Ltd Pakistan

By: Gentek Consult Ltd Turkey In Association with AAB (Pvt) Ltd PakistanMaterial type: TextTextSeries: Final Report Volume-IIPublisher: Pakistan: Ministry of Water & Power; 2014Description: 191 pages;illustrations,maps,tables,graphs,chartsSubject(s): Hydrology | Methodology | ClimateDDC classification: 621.2 FEA 2014
Contents:
Construction materials
Water quality
Main dam embankment
Tags from this library: No tags from this library for this title. Log in to add tags.
    Average rating: 0.0 (0 votes)
Item type Current location Call number Status Date due Barcode
Report Irrigation Research Institute Library - Punjab Irrigation Department

General Stacks
621.2 FEA 2014 (Browse shelf) Available PID-IRI-0000014454

Construction materials

Water quality

Main dam embankment

In English

Pbk

There are no comments on this title.

to post a comment.

Click on an image to view it in the image viewer