Local cover image
Local cover image
Image from Google Jackets

Dajal branch extension project r.d.190,000-5,39,200./ Government of Punjab Irrigation & Power Department

By: Material type: TextTextPublication details: Lahore: Government of Punjab Irrigation & Power Department; 1983.Edition: Multan Region Derajat Circle D.G.KhanDescription: Various pages,illustrations,tablesSubject(s): DDC classification:
  • 621.2 DAJ 1983
Contents:
The period of execution and completion of project spread over 8 years
Accumulative rate of escalation provided to the basic cost was simple 5/ per annum
Interest charges on capital cost was levied at 11.25/ during construction period
Tags from this library: No tags from this library for this title. Log in to add tags.
Star ratings
    Average rating: 0.0 (0 votes)
Holdings
Item type Current library Call number Status Barcode
Report Irrigation Research Institute Library - Punjab Irrigation Department General Stacks 621.2 DAJ 1983 (Browse shelf(Opens below)) Available PID-IRI-0000012877

The period of execution and completion of project spread over 8 years

Accumulative rate of escalation provided to the basic cost was simple 5/ per annum

Interest charges on capital cost was levied at 11.25/ during construction period

In English

Pbk

There are no comments on this title.

to post a comment.

Click on an image to view it in the image viewer

Local cover image