Marala Ravi Link Canal System Restoration & Improvement Project Detailed Engineering Design: Structural Design Criteria/ MRL Consultants
Material type:
- 621 MAR 1997
Item type | Current library | Call number | Status | Barcode | |
---|---|---|---|---|---|
Report | Irrigation Research Institute Library - Punjab Irrigation Department General Stacks | 621 MAR 1997 (Browse shelf(Opens below)) | Available | PID-IRI-0000011865 |
Browsing Irrigation Research Institute Library - Punjab Irrigation Department shelves, Shelving location: General Stacks Close shelf browser (Hides shelf browser)
Strandards and Procedures to Be Adopted
Structural Criteria For Hydraulic Structures
Design Conditions For Hydraulic Structures
In English
Pbk
There are no comments on this title.