Civil engineering quantities / Ivor H Seeley and George P Murray.

By: Contributor(s): Material type: TextTextPublication details: London : Macmillan, 1977.Description: xii, 242 pages : illustrations, forms, plans ; 24 cmISBN:
  • 9780333800744
Subject(s): DDC classification:
  • 624.0287 I961C 1965
Contents:
Part 1. Measurement Theory And Practice : -- Scope and Context of Civil Engineering Work Measurement -- Fundamental Principles of CESSM 3 -- Measurement Practice and Bill Production -- CESMM 3: Classes A-D: Contract and Preparatory Site Matters -- CESMM 3: Class E: Excavation, Filling and Landscaping -- CESMM 3: Classes F-H: Concrete -- CESMM 3: Classes I-L: Pipework -- CESMM 3: Classes M-O: Metalwork and Timber -- CESMM 3: Classes P & Q: Piling -- CESMM 3: Classes R-T: Roads, Rails and Tunnels -- CESMM 3: Classes U-W: Walling, Painting and Waterproofing -- CESMM 3: Classes X-Z: Miscellaneous, Renovation and Incidental Works -- Part 2. Worked Examples : -- Demolition and Site Clearance -- Excavation and Filling -- Mass Concrete Retaining Wall -- Precast Prestressed Concrete Beams -- Pumping Chamber -- Sewage Holding Tank -- Pumphouse -- Stone Faced Sea Wall -- Sewer -- Water Main -- Steel-Framed -- Gantry -- Timber Jetty -- Hybrid Piles -- Quay with Concrete and Timber Piles -- Steel Sheet Piling --Navigation Lamp Platform -- Estate Road -- Rail Track -- Tunnel -- Sewer Renovation -- Water Main Renovation.
Summary: Aimed at civil engineers and quantity surveyors and students of these disciplines in the preparation of bills of quantities.
Tags from this library: No tags from this library for this title. Log in to add tags.
Star ratings
    Average rating: 0.0 (0 votes)

Previous edition: Basingstoke: Macmillan, 1993.

Part 1. Measurement Theory And Practice : -- Scope and Context of Civil Engineering Work Measurement -- Fundamental Principles of CESSM 3 -- Measurement Practice and Bill Production -- CESMM 3: Classes A-D: Contract and Preparatory Site Matters -- CESMM 3: Class E: Excavation, Filling and Landscaping -- CESMM 3: Classes F-H: Concrete -- CESMM 3: Classes I-L: Pipework -- CESMM 3: Classes M-O: Metalwork and Timber -- CESMM 3: Classes P & Q: Piling -- CESMM 3: Classes R-T: Roads, Rails and Tunnels -- CESMM 3: Classes U-W: Walling, Painting and Waterproofing -- CESMM 3: Classes X-Z: Miscellaneous, Renovation and Incidental Works -- Part 2. Worked Examples : -- Demolition and Site Clearance -- Excavation and Filling -- Mass Concrete Retaining Wall -- Precast Prestressed Concrete Beams -- Pumping Chamber -- Sewage Holding Tank -- Pumphouse -- Stone Faced Sea Wall -- Sewer -- Water Main -- Steel-Framed -- Gantry -- Timber Jetty -- Hybrid Piles -- Quay with Concrete and Timber Piles -- Steel Sheet Piling --Navigation Lamp Platform -- Estate Road -- Rail Track -- Tunnel -- Sewer Renovation -- Water Main Renovation.

Aimed at civil engineers and quantity surveyors and students of these disciplines in the preparation of bills of quantities.